|
Engineering and Design
YITONG has a
professional team for design, research
and development, can fulfill the design
and development of new products according
to our customers’ requirements.
When customers plan to develop new
track rollers or update the old one,
we can design and develop the suitable
and economical products for our customers
according to the parameters with working
environment, load, working method,
mounting dimensions and service life
provided by them.
During the time that customers plan
to have new types, we can design and
develop bearing components, can provide
drawings for their reference. After
confirming technical requirements,
normally we can present the design
drawing to them in free charges within
two working days.
When the customers need the sample
of this new product, we can try to
produce according to the drawing confirmed.
The lead time of making sample normally
is six weeks. But the customers should
be borne the charges of mould and
special tool. If the sample should
be made a little change, we can do
in free of charge.
|